r1 - 11 Aug 2003 - 10:07:00 - JeffLustedYou are here: TWiki >  Astrogrid Web  >  DocStore > PhaseBStructure > AgCd05JobControl > AgCd05Reports > AGCd0504Report

JES and Datacenter Report

Week Ending 08/08/2003

This week:

  • 1 Datacenter code hand over
    • Some annoying errors (not unexpected - code admin) have soaked up time for JL and Martin Hill.
  • 2 Familiarization with COCOON (PJN).
    • JL still at the start stage, which is quite frightening.
  • 3 Design for JES. Not done.
  • 4 Display Job Monitor Page - initial design finished.
  • 5 Installed DB2 under Linux 8. OK but:
    • Wrinkles concerning Java coexistance
    • Bewares for Linux 7 and 9

Next week:

  • 1 Refactoring and datacenter handover
    • Need to keep a watchful eye. Possiblysome admin tidy-up (JL)
  • 2 Familiarization with COCOON (JL)
    • Initial design for Display Job Run (JL)
  • 3 Design for JES; maybe code. (JL)
  • 4 Thoughts on Workflow (JL)
  • 5 DB2 design day.
  • 6 PJN and RP - holiday
  • 7 Abstract of a poster for Strasbourg
-- JeffLusted - 11 Aug 2003
Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r1 | More topic actions
 
AstroGrid Service Click here for the
AstroGrid Service Web
This is the AstroGrid
Development Wiki
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback